EZ STREET COLD PATCH, 50LB BAGS | Vendor shall provide a price per bag for a total of 392 bags of Cold Patch Asphalt (50 LB Bags). The per bag price shall include all freight/shipping charges. The Cold Patch Asphalt (50 LB bags) shall be delivered to each of our maintenance facilities listed below. The hauler shall have the equipment available to unload the bags at each location. 24-hour advance notification of delivery is required. Deliveries to be made on Monday through Thursday only.
• 56 bags (one pallet) - Road Operations Special Projects - 28598 Lady of the Lakes Av, Tavares, FL 32778
• 112 bags (two pallets) - Maintenance Facility 1 - 2310 West Griffin Road, Leesburg, FL 34748
• 112 bags (two pallets) - Maintenance Facility 2 - 609 Disston Av, Minneola, FL 34755
• 112 bags (two pallets) - Maintenance Facility 3 - 19720 East Fifth Street, Umatilla, FL 32784 | 392 | Each |
$______________
|
$______________
|