Change made on 06/23/2026:
The bid due date has changed from 07/31/2026 to 07/08/2026.
Questions submitted and County's Response 06/29/2026:
Question 1: Is an electrical single-line and/or facility drawing package available.
County response: No drawings are available. You are expected to field-verify all existing conditions.
Question 2: Section 5 - Do you have number and identification of cables for testing.
County response: No cable list or identification is available. Field identification of cables and circuits is part of your scope.
Question 3: Section 5 - Do you have an outage time period preferred for testing
County response: Work is to be performed after business hours.
Question 4: Section 7 - Are grounding and lightning system drawings available
County response: No drawings are available.
Question 5: Section 7 - Is lightning perfection system included
County response: Lightning protection is not included in this scope.
Question 6: Section 8 - What is meant by operational checks
County response: Verify that equipment operates as intended under normal conditions — breakers, contactors, metering, and indicators.
Question 7: Section 8 - Do we operate breakers energized or do they mean secondary inject them during an outage
County response: A coordinated after-hours outage will be provided. All breaker operation shall occur during the outage window.
Question 8: Section 8 - Do you have equipment count
County response: No equipment count is available. Pricing should account for unknown quantities based on a site walkthrough from pre-bid.
Question 9: Section 8 - Can you provide more details on expectations for this topic
County response: All expectations are outlined in the SOW.